Notification
allnewsbitcoin allnewsbitcoin
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • MarketCap
  • Mining
  • Exchange
  • Metaverse
  • Regulations
  • Analysis
    • Crypto Bubbles
    • Multi Currency
    • Evaluation
Reading: SoftBank plans 10-gigawatt AI data center in Ohio fueled by $33 billion gas buildout
Share
bitcoin
Bitcoin (BTC) $ 64,745.00
ethereum
Ethereum (ETH) $ 1,912.73
xrp
XRP (XRP) $ 1.04
tether
Tether (USDT) $ 0.999369
solana
Solana (SOL) $ 75.89
bnb
BNB (BNB) $ 601.48
usd-coin
USDC (USDC) $ 0.999628
dogecoin
Dogecoin (DOGE) $ 0.069884
cardano
Cardano (ADA) $ 0.197287
staked-ether
Lido Staked Ether (STETH) $ 2,265.05
tron
TRON (TRX) $ 0.329949
chainlink
Chainlink (LINK) $ 8.26
avalanche-2
Avalanche (AVAX) $ 6.44
wrapped-bitcoin
Wrapped Bitcoin (WBTC) $ 76,243.00
wrapped-steth
Wrapped stETH (WSTETH) $ 2,779.67
the-open-network
Gram (prev. Toncoin) (GRAM) $ 1.34
stellar
Stellar (XLM) $ 0.162586
hedera-hashgraph
Hedera (HBAR) $ 0.069088
sui
Sui (SUI) $ 0.690173
shiba-inu
Shiba Inu (SHIB) $ 0.000005
weth
WETH (WETH) $ 2,268.37
leo-token
LEO Token (LEO) $ 9.75
polkadot
Polkadot (DOT) $ 0.807323
litecoin
Litecoin (LTC) $ 45.89
bitget-token
Bitget Token (BGB) $ 1.64
bitcoin-cash
Bitcoin Cash (BCH) $ 214.75
hyperliquid
Hyperliquid (HYPE) $ 54.65
usds
USDS (USDS) $ 0.999959
uniswap
Uniswap (UNI) $ 3.95
All News BitcoinAll News Bitcoin
Search
  • Home
  • News
  • Crypto
    • Altcoins
    • Bitcoin
    • Blockchain
    • Cardano
    • Ethereum
    • NFT
    • Solana
  • Market
  • MarketCap
  • Mining
  • Exchange
  • Metaverse
  • Regulations
  • Analysis
    • Crypto Bubbles
    • Multi Currency
    • Evaluation
© 2025 All Rights reserved | Powered by All News Bitcoin
Mining

SoftBank plans 10-gigawatt AI data center in Ohio fueled by $33 billion gas buildout

March 22, 2026 3 Min Read
Share
image

SoftBank plans to construct an enormous AI knowledge heart complicated in Ohio able to consuming as much as 10 gigawatts of vitality, in line with a Bloomberg report.

The power could be developed on federally owned land at a former uranium enrichment website, with the primary part anticipated to ship about 800 megawatts of capability in early 2028 at a price of between $30 billion and $40 billion, which might make it one of many largest computing facilities on this planet.

To assist development, SoftBank is backing roughly $33 billion in pure fuel vitality infrastructure, with generators already procured and anticipated to be deployed throughout the area via the top of the last decade. The overall deliberate era capability of about 9.2 gigawatts would rival a number of the largest vitality initiatives in the USA.

The size displays rising demand for AI infrastructure, as hyperscalers and governments compete to safe computing and energy capability. A ten-gigawatt knowledge heart would devour vitality similar to that of hundreds of thousands of houses, placing strain on networks already struggling to maintain up with AI-driven demand.

The challenge is linked to a broader $550 billion funding framework between the USA and Japan that features vitality and industrial infrastructure, and comes as policymakers push to safe home capability within the international AI race.

SoftBank has not but revealed the positioning’s purchasers, however mentioned companions might be concerned in supplying chips and gear. The corporate is working with native utilities to enhance transmission infrastructure, with about $4.2 billion earmarked for community growth.

See also  Wyoming Eyes AI Data Centers as Race for Bitcoin Mining Power Grows

The proposal additionally highlights the rising pressure round AI’s vitality use. The growth of knowledge facilities has sparked a backlash in some components of the U.S. over rising demand for electrical energy and water, at the same time as governments prioritize constructing capability to compete with China in superior applied sciences.

Divulgation: This text was edited by Estefano Gómez. For extra details about how we create and overview content material, please see our Editorial Coverage.

TAGGED:MiningMining NewsNews
Share This Article
Facebook Twitter Copy Link
Previous Article Bitcoin selling by old investors is declining Bitcoin selling by old investors is declining
Next Article Bitcoin Bitcoin Miner Activity Falls into Extreme Silence – Bullish Sign or Not?
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

image
Ethereum Validator Exit Queue Drops to Zero – Will It Drive ETH’s Q3 Recovery?
Ethereum
image
Solana opens validator registration for Alpenglow upgrade, targeting 150ms finality
Altcoins
Gino Matos
Three Fed officials just voted in favor of raising interest rates as Bitcoin hangs in limbo on the $62,000 shelf.
Bitcoin
image
Worst Ethereum (ETH) capitulation in history shows how bullish it really is
Ethereum
image
Analysts set key conditions for Ethereum to surpass $2,000
Ethereum
Liam 'Akiba' Wright
Three major demand drivers stall at once, leaving Bitcoin’s $64,000 support to long-term holders
Bitcoin
allnewsbitcoin
allnewsbitcoin

"We are dedicated to bringing you timely, accurate, and insightful updates to help you navigate the ever-evolving digital finance landscape."

Editor Choice

Bitcoin’s Quiet Stress Meets Fed Balance Sheet Transition
Banks have the green light to trade bitcoin in the US
Crypto analysts say Bitcoin’s parabolic ascension is still on track – this is his outlook

Follow Us on Socials

We use social media to react to breaking news, update supporters and share information

Facebook Twitter Telegram
  • About Us
  • Contact Us
  • Disclaimer
  • Privacy Policy
  • Terms of Service
Reading: SoftBank plans 10-gigawatt AI data center in Ohio fueled by $33 billion gas buildout
Share
© 2025 All Rights reserved | Powered by All News Bitcoin
Welcome Back!

Sign in to your account

Lost your password?